EdgeConneX Nashville (EDCNAS01)

EdgeConneX

EdgeConneX Nashville (EDCNAS01) is a data center operated by EdgeConneX in Nashville, TN, US. The facility is currently operational. It sits in the Nashville data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Nashville
State
TN
Country
US
Coordinates
36.1449, -86.7017
Address
1841 Air Lane Dr

Market intelligence

AVOID

Data Center Power Index verdict for Nashville — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Nashville — the market this facility sits in (full deep-dive →).

Nashville's data center footprint remains modest at 112 MW across 57 tracked facilities, with Flexential holding the largest operational position at 8 properties. The market shows fragmentation typical of secondary metros: Unknown operator controls 7 facilities, while 365 Data Centers and CenturyLink Nashville each operate 2 sites. This distribution suggests no dominant player has achieved significant density, leaving room for consolidation but also indicating limited institutional investment momentum. The DCPI verdict of AVOID reflects structural headwinds that should deter acquisition-stage investors. With excess-power scoring at 35/100—indicating chronic undersupply relative to forward demand—and constraint scoring at 32/100, Nashville faces dual pressures: insufficient available capacity on existing grids and limited near-term expansion capability. These scores place Nashville in…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketNashville
Grid operatorTVA
DC Hub Power IndexAVOID
Est. time to power10.9 months
LocationNashville, US

Power generation nearby

DC Hub tracks 16 operating generating units totalling 2,122 MW within about 50 km of Nashville, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,255 MW · 4 units · 59%
Oil/Gas664 MW · 8 units · 31%
Hydropower198 MW · 2 units · 9%
Utility-Scale Solar5 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Nashville tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,700+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-nashville-edcnas01-921a51a9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-nashville-edcnas01-921a51a9