EdgeConneX Munich (EDCMUC01)

EdgeConneX

EdgeConneX Munich (EDCMUC01) is a data center operated by EdgeConneX in Munich, DE. The facility is currently operational. It sits in the Munich data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 79.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Munich
Country
DE
Coordinates
48.1399, 11.5262
Address
Landsberger Str. 155

Market intelligence

AVOID

Data Center Power Index verdict for Munich — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Munich — the market this facility sits in (full deep-dive →).

Munich's data center infrastructure remains severely undersupplied, with just 80 tracked facilities delivering 6 MW of total capacity across the region. The market is dominated by Equinix, which operates 4 facilities, while secondary players including Eunetworks, EdgeConneX, and Finanz Informatik each maintain 2 sites. This fragmented operator base and minimal aggregate capacity reflect a market still in early consolidation stages. The DCPI verdict of AVOID is unambiguous for acquisition-focused capital. An excess-power score of 22/100 paired with a constraint rating of 66/100 signals critical infrastructure limitations that will persist through the near term. The excess-power reading indicates severe scarcity of available capacity for new or expanded deployments, while the constraint score reflects persistent grid and cooling bottlenecks that limit buildout velocity. For operators…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMunich
Grid operatorENTSOE-DE
DC Hub Power IndexAVOID
Est. time to power79.2 months
LocationMunich, DE

Power generation nearby

DC Hub tracks 356 operating generating units totalling 3,067 MW within about 50 km of Munich, DE. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,443 MW · 14 units · 47%
Utility-Scale Solar1,109 MW · 317 units · 36%
Hydropower322 MW · 7 units · 10%
Bioenergy86 MW · 6 units · 3%
Wind79 MW · 6 units · 3%
Geothermal28 MW · 6 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Munich tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-munich-edcmuc01-c30b6ff8" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-munich-edcmuc01-c30b6ff8
Schema, units and the population behind every count: https://dchub.cloud/bind