EdgeConneX Boston (EDCBOS01)

EdgeConneX

EdgeConneX Boston (EDCBOS01) is a data center operated by EdgeConneX in Billerica, MA, US. The facility is currently operational. It sits in the Waltham data-center market on the ISONE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 18.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Billerica
State
MA
Country
US
Coordinates
42.5285, -71.2495
Address
22 Linnell Circle

Market intelligence

AVOID

Data Center Power Index verdict for Waltham — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Waltham — the market this facility sits in (full deep-dive →).

Waltham hosts a fragmented five-facility ecosystem with zero measurable MW capacity tracked, dominated by a dispersed operator base with no single player holding meaningful scale. Equinix maintains dual facility presence listed separately in operator records, while Centersquare, Cogent Communications, FirstLight Fiber, and a second Equinix entity each operate single sites. The absence of tracked capacity contrasts sharply with the market's geographic position in the Boston metro corridor, suggesting either sub-scale colocation assets, dark fiber infrastructure misclassified as data center facilities, or incomplete baseline data—a red flag for institutional due diligence. The DCPI verdict of AVOID is unambiguous for acquisition-stage investors. An excess-power score of 30/100 signals critical undersupply; the market cannot reliably deliver incremental power density for hyperscale or…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWaltham
Grid operatorISONE
DC Hub Power IndexAVOID
Est. time to power18.3 months
LocationBillerica, US

Power generation nearby

DC Hub tracks 166 operating generating units totalling 6,460 MW within about 50 km of Billerica, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,579 MW · 19 units · 71%
Nuclear1,296 MW · 1 unit · 20%
Utility-Scale Solar352 MW · 135 units · 5%
Bioenergy224 MW · 6 units · 3%
Wind10 MW · 5 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Billerica tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-boston-edcbos01-810451fa" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-boston-edcbos01-810451fa
Schema, units and the population behind every count: https://dchub.cloud/bind