Edgeconnex Edcmsp01 is a data center in Minneapolis, US. The facility is currently announced. It sits in the Minneapolis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Minneapolis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Minneapolis — the market this facility sits in (full deep-dive →).
Minneapolis operates a fragmented 95 MW ecosystem across 85 tracked facilities, characterized by moderate power availability but acute infrastructure constraints. The excess-power index of 50/100 indicates borderline surplus capacity, while the constraint score of 47/100 signals that available power cannot be reliably deployed. Cologix maintains dominant position with 12 MW across multiple entities, followed by DataBank at 6 MW, fragmenting operator concentration and creating inconsistent service standards across the market. This distribution reflects a market still maturing beyond hyperscaler dominance but lacking the consolidated operators typical of tier-one hubs. The CAUTION verdict from the DCPI framework advises acquisition-focused investors to proceed with heightened due diligence and contingency planning. Unlike outright AVOID markets, Minneapolis presents conditional…
Published DC Hub data for this location.
Comparable facilities in Minneapolis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="edgeconnex-edcmsp01-c475bc3b" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edcmsp01-c475bc3b