Edgeconnex Edcmad01 is a data center in Madison, US. The facility is currently announced. It sits in the Madison data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Madison — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Madison — the market this facility sits in (full deep-dive →).
Madison's data center market is nascent and tightly constrained, with just 18 MW of tracked capacity across 18 facilities. The excess-power DCPI score of 50/100 sits at the midline—neither surplus nor acute shortage—but the constraint score of 39/100 is the binding metric, signaling material infrastructure friction. Five operators hold the market, with 5Nines Data, Network222, CenturyLink Madison, and two EdgeConneX entities each operating single facilities, indicating high fragmentation and limited scale economies. The CAUTION verdict reflects a market where power availability does not translate to buildable capacity. A constraint score below 40/100 typically signals grid interconnection delays, transmission bottlenecks, or utility-side underinvestment rather than raw megawatt scarcity. For acquisition-focused investors, this means due diligence must center on interconnection timelines…
Published DC Hub data for this location.
Comparable facilities in Madison tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="edgeconnex-edcmad01-3cbcd9da" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edcmad01-3cbcd9da