Digital Fortress (PTL3) is a data center operated by Digital Fortress in Beaverton, OR, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Beaverton data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.1-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Beaverton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Beaverton — the market this facility sits in (full deep-dive →).
Beaverton's data center footprint remains modest but operationally constrained, with 9 MW distributed across five tracked facilities dominated by Digital Fortress's two properties. The market's DCPI verdict of CAUTION reflects a fundamental tension: while the excess-power score of 52/100 suggests moderate grid availability, the constraint rating of 48/100 signals binding infrastructure limitations that offset apparent capacity. This split verdict indicates neither abundance nor scarcity, but rather an asymmetric risk profile where power exists but cannot be reliably deployed. For acquisition-focused investors, the CAUTION verdict translates to selective opportunity rather than strategic hold. The 52/100 excess-power score ranks above markets like Prineville 47/100, suggesting Beaverton has retained some grid flexibility compared to harder-constrained peers. However, the 48/100…
Published DC Hub data for this location.
Comparable facilities in Beaverton tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="digital-fortress-ptl3-e2f6f76b" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=digital-fortress-ptl3-e2f6f76b