Datacamp Prague is a data center in Prague, CZ. The facility is currently announced. It sits in the Prague data-center market on the ENTSOE-CZ grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 60.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Prague — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Prague — the market this facility sits in (full deep-dive →).
Prague's data center market remains severely constrained, with only 69 tracked facilities totaling 10 MW of capacity spread across a fragmented operator base. The excess-power score of 22/100 signals acute scarcity—the market has minimal headroom for new workload absorption—while the constraint rating of 63/100 reflects critical infrastructure bottlenecks that prevent rapid scaling. This combination places Prague among the tightest markets in Central Europe, comparable to Vienna's constraint score of 61/100 and Zurich's excess-power deficit of 25/100. For acquisition-focused investors, the DCPI verdict of AVOID is unambiguous. The dual pressure of power scarcity and infrastructure constraints means that acquiring or deploying capacity here requires either significant capex remediation or acceptance of severe utilization ceilings. Buyers cannot assume landlord-friendly power availability…
Published DC Hub data for this location.
Comparable facilities in Prague tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="datacamp-prague-f53077a6" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=datacamp-prague-f53077a6