Databank Granite Point North Data Center Slc2 is a data center operated by Databank Granite Point North Data Center in Salt Lake City, US. The facility is currently announced. It sits in the Salt Lake City data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 19.4-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Salt Lake City — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Salt Lake City — the market this facility sits in (full deep-dive →).
Salt Lake City's data center footprint spans 604 MW across 87 tracked facilities, positioning it as a mid-tier regional hub with meaningful capacity but constrained growth headroom. Flexential dominates the operator landscape, controlling 17 facilities 12 primary + 5 subsidiary, while secondary players DataBank, Aligned, and Tract each operate 3–5 sites. The market's geographic concentration—particularly around geothermal and cooling infrastructure corridors near the Great Salt Lake—has attracted developer interest, though this same clustering amplifies infrastructure dependency. The DCPI verdict of CAUTION reflects a market in tension: the excess-power score of 54/100 indicates moderate surplus generation capacity, but the constraint rating of 52/100 signals that colocation and lease-ready infrastructure face material headwinds. For acquisition-focused investors, this bifurcated signal…
Published DC Hub data for this location.
Comparable facilities in Salt Lake City tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="databank-granite-point-north-data-center-slc2-90143fc8" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=databank-granite-point-north-data-center-slc2-90143fc8