CyrusOne SAT10 & SAT11

CyrusOne SAT10 & SAT11 is a data center operated by CyrusOne in San Antonio, TX, US. The facility is currently operational. It sits in the San Antonio data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 28.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
San Antonio
State
TX
Country
US
Coordinates
29.4182, -98.7878

Market intelligence

CAUTION

Data Center Power Index verdict for San Antonio — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Antonio — the market this facility sits in (full deep-dive →).

San Antonio's data center market comprises 81 tracked facilities totaling 1,797 MW, but the DCPI verdict of CAUTION reflects structural tension: excess-power availability scores a healthy 64/100, yet constraint risk sits elevated at 53/100, signaling that while generation capacity exists, grid infrastructure and distribution bottlenecks pose real friction. Microsoft leads operator presence with 12 facilities, followed by three operators at 9 facilities each Unknown, CyrusOne, and a third unnamed player, with Vantage Data Centers holding 4 sites. No recent M&A has been tracked in the market, suggesting either mature asset ownership or suppressed transaction velocity. The CAUTION verdict demands disciplined capital deployment rather than avoidance. Buyers evaluating acquisition or expansion here should stress-test power delivery timelines and interconnection queue depth—the 53/100…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketSan Antonio
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power28.3 months
LocationSan Antonio, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 25 operating generating units totalling 4,377 MW within about 50 km of San Antonio, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,833 MW · 14 units · 65%
Coal1,444 MW · 2 units · 33%
Utility-Scale Solar100 MW · 9 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in San Antonio tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 24,400+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-sat10-sat11-san-antonio-f0eefdb3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind