Cyrusone Raleigh Durham I Data Center is a data center in Durham, US. The facility is currently announced. It sits in the Durham data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Durham — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Durham — the market this facility sits in (full deep-dive →).
Durham's data center market is nascent and severely underpowered, with 22 tracked facilities totaling 0 MW of operational capacity. The market's DCPI excess-power score of 37/100 indicates minimal spare generation capacity to support new or expanded deployments, while the constraint score of 31/100 reflects acute limitations in physical power delivery infrastructure. This combination places Durham below viability thresholds established in peer markets like Charlotte constraint: 34/100 and Raleigh, where similar power deficits have driven consistent AVOID verdicts among acquisition-focused operators. The dual AVOID verdict—rooted in both excess-power and constraint metrics—signals that Durham lacks the foundational infrastructure necessary for acquisition-stage investment. Operators seeking to acquire existing facilities or expand operations face a market where electrical headroom is…
Published DC Hub data for this location.
Comparable facilities in Durham tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="cyrusone-raleigh-durham-i-data-center-8aacc753" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-raleigh-durham-i-data-center-8aacc753