CyrusOne Mason

CyrusOne

CyrusOne Mason is a data center operated by CyrusOne in Mason, OH, US. The facility is currently operational. It sits in the West Chester data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Mason
State
OH
Country
US
Coordinates
39.3039, -84.3116
Address
4800 Parkway Dr suite 100

Market intelligence

AVOID

Data Center Power Index verdict for West Chester — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on West Chester — the market this facility sits in (full deep-dive →).

West Chester's data center market remains nascent, with only 5 tracked facilities totaling 0 MW of operational capacity. This absence of measurable footprint distinguishes it sharply from comparable regional markets and signals either early-stage development or minimal institutional investment. Flexential operates the largest presence with two facilities, while a single unnamed operator and Flexential Corp. each control one site; operator fragmentation is notable given the market's minimal scale. No recent M&A activity has been recorded, underscoring the lack of transactional momentum. The DCPI verdict of AVOID stems from compounded structural constraints: an excess-power rating of 39/100 indicates insufficient or unreliable power supply relative to demand, while a constraint score of 42/100 signals broader operational challenges—likely including interconnection delays, grid congestion,…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWest Chester
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power15.4 months
LocationMason, US

Power generation nearby

DC Hub tracks 43 operating generating units totalling 6,574 MW within about 50 km of Mason, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,879 MW · 26 units · 59%
Coal1,784 MW · 3 units · 27%
Utility-Scale Solar912 MW · 14 units · 14%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Mason tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-cyrusone-mason-8fbb63d9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cyrusone-mason-8fbb63d9
Schema, units and the population behind every count: https://dchub.cloud/bind