CyrusOne Madrid 1

CyrusOne

CyrusOne Madrid 1 is a data center operated by CyrusOne in Madrid, ES. The facility is currently operational. It sits in the Madrid data-center market on the ENTSOE-ES grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 68.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Madrid
Country
ES
Coordinates
40.5358, -3.6592
Address
Calle de EL Nevero

Market intelligence

AVOID

Data Center Power Index verdict for Madrid — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Madrid — the market this facility sits in (full deep-dive →).

Madrid's data center market comprises 114 tracked facilities totaling 75 MW, dominated by Digital Realty with 4 facilities and a cluster of three operators—Equinix, Inc., Equinix, and Asociación ESpanix—each running 3 facilities, alongside Colt Technology Services Madrid with 2 sites. The market shows fragmentation at the operator level despite moderate scale, with no single player commanding decisive control. Recent M&A activity remains thin: the Nabiax transaction valued at $870 million represents the only tracked deal, signaling either conservative consolidation or limited liquidity in the institutional buyer base. The DCPI verdict of AVOID reflects acute structural constraints that should deter acquisition-focused investors. The excess-power score of 32/100 indicates Madrid operates near full capacity utilization, leaving minimal headroom for demand surges or unplanned maintenance.…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMadrid
Grid operatorENTSOE-ES
DC Hub Power IndexAVOID
Est. time to power68.8 months
LocationMadrid, ES

Power generation nearby

DC Hub tracks 54 operating generating units totalling 743 MW within about 50 km of Madrid, ES. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar637 MW · 51 units · 86%
Oil/Gas77 MW · 2 units · 10%
Bioenergy29 MW · 1 unit · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Madrid tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-cyrusone-madrid-1-7e05a24a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cyrusone-madrid-1-7e05a24a
Schema, units and the population behind every count: https://dchub.cloud/bind