CyrusOne Dallas (Carrollton)

CyrusOne

CyrusOne Dallas (Carrollton) is a data center operated by CyrusOne in Carrollton, TX, US. The facility is currently operational. It sits in the Carrollton data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 55.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Carrollton
State
TX
Country
US
Coordinates
32.9919, -96.9305
Address
1649 Frankford Rd. West

Market intelligence

CAUTION

Data Center Power Index verdict for Carrollton — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Carrollton — the market this facility sits in (full deep-dive →).

Carrollton's data center footprint remains modest but operationally sound: seven tracked facilities totaling 55 MW across two anchor operators. CyrusOne dominates with five facilities four under the primary brand, one under Inc., while Digital Realty operates two sites. The market shows no recent M&A activity, leaving the operator roster static and suggesting limited consolidation pressure to date. The DCPI verdict of CAUTION reflects a market in early-stage constraint. With an excess-power score of 65/100 and a constraint score of 58/100, Carrollton sits in an uncomfortable middle ground for acquisition-focused investors. The 65 excess-power reading indicates adequate spare capacity on paper, but the constraint score of 58/100—notably higher than Chantilly's 56/100 threshold—signals emerging grid or infrastructure friction. For buy-side operators, this combination means the market…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketCarrollton
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power55.0 months
LocationCarrollton, US

Power generation nearby

DC Hub tracks 27 operating generating units totalling 6,311 MW within about 50 km of Carrollton, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,770 MW · 17 units · 91%
Utility-Scale Solar542 MW · 10 units · 9%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Carrollton tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-cyrusone-dallas-carrollton-e0221228" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cyrusone-dallas-carrollton-e0221228
Schema, units and the population behind every count: https://dchub.cloud/bind