CyrusOne Cincinnati-Mason CIN3 is a data center operated by CyrusOne in Mason, OH, US. The facility is currently operational. It sits in the West Chester data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 36.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for West Chester — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on West Chester — the market this facility sits in (full deep-dive →).
West Chester is a fragmented, undersized market with tight infrastructure that limits expansion potential. The region supports only 5 tracked facilities totaling 10 MW—a footprint comparable to single-building deployments in tier-one metros. Flexential operates two of these sites, establishing modest market presence, while three other operators including one unidentified player each run single facilities. The market has recorded no recent M&A activity, signaling limited investor appetite and absence of consolidation momentum. The DCPI verdict of AVOID reflects structural headwinds that should deter acquisition-focused investors. The excess-power score of 30/100 indicates tight available capacity relative to installed infrastructure, while the constraint score of 49/100 signals moderate-to-severe friction in grid interconnection, transmission, or zoning that compounds expansion…
Published DC Hub data for this location.
Comparable facilities in Mason tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="cyrusone-cincinnati-mason-cin3-453dabc9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cincinnati-mason-cin3-453dabc9