CyrusOne CIN2

CyrusOne

CyrusOne CIN2 is a data center operated by CyrusOne in Cincinnati, OH, US. The facility is currently operational. It sits in the Cincinnati data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 26.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Cincinnati
State
OH
Country
US
Coordinates
39.1027, -84.5179

Market intelligence

AVOID

Data Center Power Index verdict for Cincinnati — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Cincinnati — the market this facility sits in (full deep-dive →).

Cincinnati's data center market is small and severely constrained: 31 tracked facilities totaling 101 MW across a fragmented operator base. CyrusOne operates the largest footprint with four facilities, followed by Flexential with three and a trio of regional operators H5, CenturyLink, Cincinnati Bell holding smaller stakes. This operator atomization reflects a market that has not attracted major hyperscale consolidation, and the absence of tracked M&A activity underscores limited deal velocity in the region. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. With excess power at 38/100—below the threshold for comfortable greenfield or retrofit economics—and constraint scored at 45/100, Cincinnati presents a dual friction trap. The excess-power score signals that new colocation capacity will face real grid headroom challenges; the constraint score indicates that…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketCincinnati
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power26.6 months
LocationCincinnati, US

Power generation nearby

DC Hub tracks 38 operating generating units totalling 7,667 MW within about 50 km of Cincinnati, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal4,009 MW · 7 units · 52%
Oil/Gas3,209 MW · 19 units · 42%
Utility-Scale Solar265 MW · 10 units · 3%
Hydropower183 MW · 2 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Cincinnati tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-cin2-637b842a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cin2-637b842a
Schema, units and the population behind every count: https://dchub.cloud/bind