Compass Dallas 2 is a data center operated by Compass in Red Oak, TX, US. It carries a reported power capacity of 60.0 MW and is currently operational. It sits in the Red Oak data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 58.1-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Red Oak — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Red Oak — the market this facility sits in (full deep-dive →).
Red Oak hosts 865 MW across eight tracked facilities, dominated by Compass Data Center entities 6 of 8 facilities, with DataBank and one unknown operator rounding out the roster. The market's excess-power score of 65/100 indicates moderate availability, but the constraint rating of 53/100 signals meaningful infrastructure friction—neither abundant nor critically bottlenecked, but squarely in the caution zone. DataBank's $1.45 billion financing for its Red Oak AI campus underscores serious operator conviction in the market's expansion potential, though construction-phase momentum does not automatically translate to operational economics. For acquisition-focused investors, the DCPI verdict warrants selective, not wholesale, entry. A constraint score of 53/100 means that purchasing existing capacity offers limited upside; infrastructure headroom is real but not generous, and new build-outs…
Published DC Hub data for this location.
Comparable facilities in Red Oak tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="compass-dallas-2-15707e4e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=compass-dallas-2-15707e4e