Cologix DSM2 — Cedar Falls Data Center

Cologix

Cologix DSM2 is a data center operated by Cologix in Cedar Falls, IA, US. The facility is currently operational. It sits in the Cedar Falls data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Cedar Falls
State
IA
Country
US
Coordinates
42.4740, -92.4588
Address
1205 Technology Parkway

Market intelligence

AVOID

Data Center Power Index verdict for Cedar Falls — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Cedar Falls — the market this facility sits in (full deep-dive →).

Cedar Falls currently hosts three data center facilities totaling 0 MW of tracked capacity, operated by Cologix two facilities and Connect Des Moines, LLC one facility, representing a fragmented and nascent market footprint. The market's excess-power score of 46/100 indicates moderate availability relative to demand, while the constraint score of 34/100 reveals meaningful infrastructure limitations that will shape deployment economics and timeline risk. This combination—middling power supply paired with material operational constraints—creates a structurally challenged environment that differs markedly from adjacent Iowa markets seeing active development. The DCPI verdict of AVOID carries direct implications for acquisition-focused investors and new entrants. A constraint score of 34/100 signals that power infrastructure cannot reliably support incremental capacity additions at scale;…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketCedar Falls
Grid operatorMISO
DC Hub Power IndexAVOID
Est. time to power16.2 months
LocationCedar Falls, US

Power generation nearby

DC Hub tracks 15 operating generating units totalling 1,550 MW within about 50 km of Cedar Falls, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,159 MW · 7 units · 75%
Wind384 MW · 5 units · 25%
Utility-Scale Solar7 MW · 3 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Cedar Falls tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cologix-cologix-dsm2-42c0b7b4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cologix-cologix-dsm2-42c0b7b4
Schema, units and the population behind every count: https://dchub.cloud/bind