Chunghwa Telecom Cht Taipei Data Center is a data center in Taipei, TW. The facility is currently announced. It sits in the Taipei data-center market on the TAIPOWER grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Taipei — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Taipei — the market this facility sits in (full deep-dive →).
Taipei's data center market remains severely undersupplied, with just 44 tracked facilities delivering 7 MW of total capacity across a fragmented operator base. The excess-power score of 20/100 reflects acute capacity scarcity, indicating that available power resources fall far short of demand. The constraint rating of 59/100 signals material operational and expansion friction, placing Taipei among the most restricted markets in the region. This dual pressure—both insufficient power surplus and high structural constraints—creates a market where growth is artificially capped rather than naturally throttled. For acquisition-focused investors, the DCPI verdict of AVOID is definitive. The 20/100 excess-power rating means there is minimal room to absorb incremental tenant demand or operational flexibility; any near-term expansion will require either power infrastructure upgrades lengthy and…
Published DC Hub data for this location.
Comparable facilities in Taipei tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="chunghwa-telecom-cht-taipei-data-center-de49193d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=chunghwa-telecom-cht-taipei-data-center-de49193d