Chindata MY1 — Johor Bahru Data Center

Chindata

Chindata Johor MY1 is a data center operated by Chindata in Johor Bahru, MY. The facility is currently operational. It sits in the Johor data-center market on the TNB grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Johor Bahru
Country
MY
Coordinates
1.4927, 103.7414

Market intelligence

AVOID

Data Center Power Index verdict for Johor — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Johor — the market this facility sits in (full deep-dive →).

Johor's data center market remains structurally constrained despite rising regional interest. The market operates 430 MW across 11 tracked facilities, with Bridge Data Centres leading operator presence at two sites, followed by single-facility operators including Equinix and Keppel Data Centres Holding Pte Ltd. Power availability remains the binding constraint: the DCPI excess-power score of 43/100 paired with a constraint rating of 41/100 signals tight grid conditions that leave minimal room for unplanned demand or facility expansion without infrastructure upgrades. The AVOID verdict carries direct implications for acquisition-focused investors. A combined excess-power and constraint score below 85/100 indicates insufficient headroom for growth capex or operational flexibility. Buyers entering Johor should model power augmentation costs as a material line item rather than a secondary…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketJohor
Grid operatorTNB
DC Hub Power IndexAVOID
Est. time to power10.8 months
LocationJohor Bahru, MY

Power generation nearby

DC Hub tracks 155 operating generating units totalling 22,288 MW within about 50 km of Johor Bahru, MY. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas18,300 MW · 51 units · 82%
Coal3,230 MW · 6 units · 14%
Bioenergy438 MW · 7 units · 2%
Utility-Scale Solar320 MW · 91 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Johor Bahru tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="chindata-chindata-johor-my1-da1873cd" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=chindata-chindata-johor-my1-da1873cd
Schema, units and the population behind every count: https://dchub.cloud/bind