Centurylink W Bellevue is a data center in Omaha, US. The facility is currently announced. It sits in the Omaha data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Omaha — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Omaha — the market this facility sits in (full deep-dive →).
Omaha's data center market consists of 34 tracked facilities totaling 856 MW, anchored by Google's five-facility footprint and a fragmented operator base that includes CyrusOne, Centurylink W Bellevue, and a significant tail of smaller or unknown operators. The market's power availability is robust relative to constraint risk: the excess-power score of 68/100 indicates substantial unutilized generation or transmission capacity, while the constraint score of 36/100 suggests moderate but manageable infrastructure bottlenecks. This profile positions Omaha as materially less constrained than peer markets like Milwaukee 39/100 constraint or Monroe 250 MW across three facilities facing structural capacity limits. The BUILD verdict signals a compelling entry thesis for greenfield or expansion-stage operators. The 68/100 excess-power score is the primary driver—it reflects either surplus…
Published DC Hub data for this location.
Comparable facilities in Omaha tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="centurylink-w-bellevue-43ff3fe5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=centurylink-w-bellevue-43ff3fe5