Centurylink Tulsa is a data center in Tulsa, US. The facility is currently announced. It sits in the Tulsa data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 23.0-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Tulsa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tulsa — the market this facility sits in (full deep-dive →).
Tulsa's data center footprint remains nascent at 4 MW across 25 tracked facilities, reflecting a market in early-stage consolidation. TierPoint leads operator share with 6 MW of tracked capacity, followed by fragmented smaller players including Compass Datacenters Tulsa I. The operator landscape is dominated by unknown entities 6 facilities, suggesting either sub-scale deployments or assets outside mainstream commercial tracking. No recent M&A has been recorded in the market, indicating limited institutional attention to date. The DCPI verdict of BUILD is grounded in a critical imbalance: excess-power availability scores 77/100 while constraint risk registers only 49/100. This spread signals genuine infrastructure headroom rather than speculative positioning. For acquisition-focused investors, this verdict inverts the calculus seen in peer markets like Spokane constraint 43/100, AVOID…
Published DC Hub data for this location.
Comparable facilities in Tulsa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="centurylink-tulsa-f1ab2800" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=centurylink-tulsa-f1ab2800