Bouygues Télécom

Bouygues Télécom is a data center in Nanterre, FR. The facility is currently operational. It sits in the Paris data-center market on the ENTSOE-FR grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 33.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Paris
City
Nanterre
Country
FR
Coordinates
48.9022, 2.1932

Market intelligence

AVOID

Data Center Power Index verdict for Paris — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Paris — the market this facility sits in (full deep-dive →).

Paris hosts 295 tracked facilities totaling 356 MW across a fragmented operator base, with no single dominant player. Equinix maintains the largest presence with 24 MW across multiple entries, followed by Digital Realty at 15 MW, while 19 MW remains attributed to operators with incomplete naming conventions. Recent ground-breaking activity by Digital Realty and a 75 MW partnership between Segro and Pure DC underscore continued infrastructure investment in the region, though these represent early-stage commitments rather than operational additions to the current base. The DCPI verdict of AVOID reflects structural constraints that should deter most acquisition strategies. The constraint score of 60/100 places Paris in the high-friction zone—comparable to Marseille's 58/100—signaling grid connection bottlenecks, permitting delays, or power availability friction that materially limits…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketParis
Grid operatorENTSOE-FR
DC Hub Power IndexAVOID
Est. time to power33.6 months
LocationNanterre, FR

Power generation nearby

DC Hub tracks 50 operating generating units totalling 1,921 MW within about 50 km of Nanterre, FR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,397 MW · 10 units · 73%
Utility-Scale Solar272 MW · 30 units · 14%
Bioenergy147 MW · 4 units · 8%
Wind105 MW · 6 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Nanterre tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="bouygues-tlcom-bouygues-tlcom-10acf867" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=bouygues-tlcom-bouygues-tlcom-10acf867
Schema, units and the population behind every count: https://dchub.cloud/bind