Bics Diegem is a data center in Brussels, BE. The facility is currently announced. It sits in the Brussels data-center market on the ENTSOE-BE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 77.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Brussels — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Brussels — the market this facility sits in (full deep-dive →).
Brussels hosts 72 tracked data center facilities totaling 10 MW of operational capacity, making it a micro-scale market dominated by Bics Brussels with three sites and a fragmented operator base that includes Digital Realty and AtlasEdge alongside smaller players. The market's power infrastructure remains severely constrained, with a constraint score of 68/100—among the highest risk levels for expansion—while excess-power capacity stands at just 14/100, indicating minimal headroom for incremental demand absorption. The absence of recent M&A activity underscores the market's limited investment momentum despite its geographic proximity to Western Europe's core data center corridors. The DCPI verdict of AVOID is unambiguous for acquisition-focused capital. High constraint ratings 68/100 signal that grid interconnection, power delivery reliability, and spatial limitations will materially…
Published DC Hub data for this location.
Comparable facilities in Brussels tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="bics-diegem-33c0766d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=bics-diegem-33c0766d