B

📍

B is a data center. The facility is currently operational. It sits in the Vienna data-center market on the ENTSOE-AT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 42.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Coordinates
48.1592, 16.3421

Market intelligence

AVOID

Data Center Power Index verdict for Vienna — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Vienna — the market this facility sits in (full deep-dive →).

Vienna's data center market remains fragmented and undersupplied, with 103 tracked facilities totaling 0 MW of identifiable capacity and no recent M&A activity to indicate institutional appetite or consolidation momentum. The operator base is distributed across small holdings: the top five operators control just 5 MW each, while secondary players like Raiffeisen Informatik GmbH & Co KG and Equinix each operate 3 MW facilities. This atomization reflects a market still in early institutional adoption, lacking the scale or critical mass that typically attracts large-cap investment. The DCPI verdict of AVOID is unambiguous for acquisition-focused capital. An excess-power score of 27/100 paired with a constraint rating of 61/100 signals acute structural risk: power availability is severely limited, and infrastructure constraints will block incremental capacity deployment without major grid…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketVienna
Grid operatorENTSOE-AT
DC Hub Power IndexAVOID
Est. time to power42.8 months

Power generation nearby

DC Hub tracks 164 operating generating units totalling 5,809 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,430 MW · 8 units · 42%
Wind2,137 MW · 93 units · 37%
Hydropower793 MW · 3 units · 14%
Utility-Scale Solar372 MW · 55 units · 6%
Bioenergy76 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="b-f0e56656" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=b-f0e56656
Schema, units and the population behind every count: https://dchub.cloud/bind