AWS Pennsylvania Campus

AWS

AWS Pennsylvania Campus is a data center operated by AWS in Lehigh Valley, PA, US. It carries a reported power capacity of 400.0 MW and is currently under construction. It sits in the Bethlehem data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
400.0 MW
Status
Under Construction
City
Lehigh Valley
State
PA
Country
US
Coordinates
40.6023, -75.4714

Market intelligence

AVOID

Data Center Power Index verdict for Bethlehem — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Bethlehem — the market this facility sits in (full deep-dive →).

Bethlehem's data center footprint remains minimal: seven tracked facilities totaling zero operational megawatts, dominated by TierPoint's four combined facilities across multiple legal entities. The market shows fragmentation typical of early-stage consolidation, with Colocation America Corporation and TierPoint Pennsylvania Two LLC each operating single sites. No recent M&A activity has been recorded in the market, suggesting either stability or limited investor interest. The DCPI verdict of AVOID carries direct implications for acquisition-stage investors: an excess-power score of 36/100 signals constrained capacity for growth, while a constraint rating of 31/100 indicates that infrastructure limitations—likely grid interconnection or utility capacity—will restrict expansion timelines and economics. This dual-metric warning mirrors structural headwinds seen in comparable Pennsylvania…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketBethlehem
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power10.7 months
LocationLehigh Valley, US
Reported capacity400.0 MW

Power generation nearby

DC Hub tracks 45 operating generating units totalling 8,671 MW within about 50 km of Lehigh Valley, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,429 MW · 10 units · 63%
Nuclear2,388 MW · 2 units · 28%
Hydropower453 MW · 1 unit · 5%
Coal228 MW · 2 units · 3%
Utility-Scale Solar173 MW · 30 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Lehigh Valley tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,700+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="aws-aws-pennsylvania-campus-04316357" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=aws-aws-pennsylvania-campus-04316357
Schema, units and the population behind every count: https://dchub.cloud/bind