Aureon Aureon Data Center is a data center in Des Moines, US. The facility is currently announced. It sits in the Des Moines data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 18.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Des Moines — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Des Moines — the market this facility sits in (full deep-dive →).
Des Moines hosts 40 tracked data center facilities totaling 832 MW, dominated by Meta's 7 locations and a fragmented "Unknown" operator category holding 9 sites, with Microsoft and Cologix maintaining smaller footprints at 3 and 2 facilities respectively. The market's capacity concentration reflects Meta's substantial regional presence, yet operator fragmentation outside the hyperscaler tier suggests structural inefficiencies. No recent M&A activity has been tracked, indicating a relatively dormant transaction environment despite the region's scale. The DCPI verdict of AVOID carries direct implications for acquisition-focused investors: the excess-power score of 48/100 paired with a constraint reading of 43/100 signals a market caught between two unfavorable conditions. Excess power availability at roughly mid-range levels means competitive pricing pressure from existing capacity, while…
Published DC Hub data for this location.
Comparable facilities in Des Moines tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="aureon-aureon-data-center-cc20ac18" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=aureon-aureon-data-center-cc20ac18