Atomicdata Minneapolis East is a data center operated by Atomicdata Minneapolis in Minneapolis, US. The facility is currently announced. It sits in the Minneapolis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Minneapolis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Minneapolis — the market this facility sits in (full deep-dive →).
Minneapolis's data center market is operationally mature but severely constrained, with 89 tracked facilities delivering 95 MW across a fragmented operator base. Cologix dominates with a combined 14 MW footprint split across two entity registrations, while DataBank holds 6 MW and a third operator controls 3 MW. The market's power infrastructure has reached a critical bottleneck: the DCPI excess-power score of 46/100 paired with a constraint rating of 45/100 signals that available spare capacity is nearly exhausted, and physical/regulatory constraints are actively blocking expansion. For acquisition-focused investors, the DCPI "AVOID" verdict is unambiguous. A constraint score of 45/100 places Minneapolis in the same structural bind as Washington, DC 50/100 constraint—meaning new builds face regulatory headwinds or utility grid limitations, and existing operators cannot easily scale…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Minneapolis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="atomicdata-minneapolis-east-cde103f4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect