Atlas Edge Data Centres Zurich is a data center in Zurich, CH. The facility is currently announced. It sits in the Zurich data-center market on the ENTSOE-CH grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 33.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Zurich — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Zurich — the market this facility sits in (full deep-dive →).
Zurich's data center footprint remains modest but consolidated, with 83 tracked facilities delivering 110 MW of total capacity across a tight operator ecosystem. Equinix maintains the largest presence with 5 facilities, matched by Vantage Data Centers' 5 sites, while Orange Business Services Zurich and a second Equinix entry each operate 3 facilities. Init7 Winterthur rounds out the top five with 2 sites. The market has attracted anchor-tenant investment: Digital Realty is actively constructing its fourth Zurich data center ZUR4, a 15 MW greenfield project scheduled for completion in August 2026. No recent M&A transactions have been tracked in the local market, signaling limited secondary acquisition activity. The DCPI verdict of AVOID carries material weight for acquisition-focused investors. The excess-power rating of 25/100 indicates severe capacity scarcity—the market lacks surplus…
Published DC Hub data for this location.
Comparable facilities in Zurich tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="atlas-edge-data-centres-zurich-b3255e8a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=atlas-edge-data-centres-zurich-b3255e8a