Ascent Data Pittsburgh is a data center in Pittsburgh, US. The facility is currently announced. It sits in the Pittsburgh data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Pittsburgh — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Pittsburgh — the market this facility sits in (full deep-dive →).
Pittsburgh's data center market consists of 56 tracked facilities totaling 18 MW across a fragmented operator base, with DataBank leading at 6 facilities. The market faces a dual constraint: both power availability and operational constraints score 35/100 on the DCPI framework, indicating structural limitations that extend beyond simple supply shortages. The top five operators—DataBank 6, Expedient 3, EdgeConneX 2, DQE Communications LLC 2, and DataBank, Ltd. 2—collectively control only 15 of 56 facilities, leaving significant tail distribution that amplifies fragmentation risk. The AVOID verdict reflects genuine scarcity constraints rather than market weakness. A constraint score of 35/100 means that even available power capacity faces either interconnection delays, transmission bottlenecks, or utility coordination friction that degrades deployment economics. For acquisition-focused…
Published DC Hub data for this location.
Comparable facilities in Pittsburgh tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ascent-data-pittsburgh-d1e4e3a9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=ascent-data-pittsburgh-d1e4e3a9