Applied Digital Garden City is a data center operated by Applied Digital in Garden City, TX, US. It carries a reported power capacity of 100.0 MW and is currently operational. It sits in the Midland–Odessa data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 9.6-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Midland–Odessa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Midland–Odessa — the market this facility sits in (full deep-dive →).
Midland–Odessa hosts a nascent but strategically positioned data center cluster with 50 MW across six tracked facilities and fragmented operator ownership that creates acquisition opportunities. The market's four tracked operators—Crusoe Energy, Od IX Odessa, Unit Is Odessa, and Wildpark Nikolaev—each control single facilities, indicating a non-consolidated landscape typical of emerging Permian Basin compute hubs. This operator atomization contrasts sharply with mature markets like Dallas, where leading operators DataBank, Digital Realty, Equinix operate 14–17 facilities each, suggesting Midland–Odessa remains in early consolidation stages. The DCPI verdict of BUILD—driven by excess power availability 85/100 paired with minimal transmission constraint 22/100—signals a market fundamentally mismatched with current infrastructure. Excess power without constraint relief typically indicates…
Published DC Hub data for this location.
Comparable facilities in Garden City tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="applied-digital-garden-city-e6115cea" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=applied-digital-garden-city-e6115cea