Apple Prineville Datacenter is a data center operated by Apple in Prineville, OR, US. The facility is currently operational. It sits in the Prineville data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Prineville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Prineville — the market this facility sits in (full deep-dive →).
Prineville's tracked data center footprint remains minimal, with 23 facilities totaling 0 MW across a fragmented operator base dominated by two unnamed entities holding 10 MW each, followed by Meta 2 MW and Apple 1 MW. The market's low absolute capacity masks a structural problem: power availability and grid constraints are nearly balanced at opposing extremes, suggesting the market is caught between scarcity and saturation rather than enjoying healthy equilibrium. No recent M&A activity has been recorded, indicating either dormancy or opacity in deal flow. The DCPI verdict—excess-power 47/100 paired with constraint 48/100—delivers an unambiguous signal: AVOID. This configuration is the inverse of a buyer's advantage; the constraint score approaching the midline signals that available grid infrastructure is already under pressure, while the excess-power metric reflects either surplus…
Published DC Hub data for this location.
Comparable facilities in Prineville tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="apple-prineville-datacenter-01e8d8be" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=apple-prineville-datacenter-01e8d8be