Aixit Aix A1 is a data center in Vienna, AT. The facility is currently announced. It sits in the Vienna data-center market on the ENTSOE-AT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 42.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Vienna — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Vienna — the market this facility sits in (full deep-dive →).
Vienna's data center market remains structurally constrained, with 103 tracked facilities totaling negligible operational capacity and a fragmented operator base. The market is dominated by a five-way tie at the top, with two operators holding 5 facilities each, while Raiffeisen Informatik GmbH & Co KG and Equinix each operate 3 sites. This distribution reflects the city's status as a secondary European hub, lacking the scale consolidation seen in Frankfurt or Amsterdam. The absence of any recent M&A activity in the tracked dataset signals investor caution or limited available assets for acquisition. The DCPI verdict of AVOID carries decisive weight for acquisition-focused investors. Vienna scores 27/100 on excess-power capacity—indicating severe power supply scarcity—and 61/100 on infrastructure constraints, placing it in the high-friction investment category. This dual pressure…
Published DC Hub data for this location.
Comparable facilities in Vienna tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="aixit-aix-a1-90614992" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=aixit-aix-a1-90614992