Aecom Grand Rapids is a data center in Grand Rapids, US. The facility is currently announced. It sits in the Grand Rapids data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 30.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Grand Rapids — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Grand Rapids — the market this facility sits in (full deep-dive →).
Grand Rapids operates 14 tracked facilities totaling 130 MW across a fragmented operator base led by US Signal and Switch, each with two facilities. The market exhibits moderate power availability 58/100 but faces meaningful infrastructure constraints 53/100, placing it at an inflection point. Regional utility DTE has announced an expansion to its five-year capital investment plan to support power delivery, signaling confidence in near-term demand. However, the absence of recent M&A activity suggests investor caution or limited seller appetite at current valuations. The DCPI verdict of CAUTION reflects a market where acquisition or expansion requires discipline. The constraint score of 53/100 indicates that power infrastructure poses operational risk—not yet critical, but elevated enough to demand due diligence on utility interconnection timelines and grid headroom. Unlike markets with…
Published DC Hub data for this location.
Comparable facilities in Grand Rapids tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="aecom-grand-rapids-d862d9d0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=aecom-grand-rapids-d862d9d0