DC Hub · DCPI International

International Data Center Placement Intelligence

DCPI extends beyond the 286 US/Canadian ISO zones with first-class coverage of two international grids, plus the Nordic bidding zones measured via ENTSO-E. Each feed below is live.

Grid Installed Capacity Generation Mix As Of
AESO
Alberta, Canada
— data unavailable Nov 22, 2026 17:22 UTC
Hydro-Québec
Québec, Canada
— data unavailable 2026-11-22 16:30:00 UTC

Why international DCPI matters

Hyperscaler capex is spilling out of saturated US markets (Northern VA at AVOID, Atlanta caution) and into jurisdictions with low-carbon power surplus. Hydro-Québec (94% hydro), the Nordics (2024 annual mix: 51% hydro + 19% wind + 18% nuclear), and AESO (Alberta, with emerging wind-solar at low LCOE) are three frontiers operator capex planners now actively evaluate.

API: GET /api/v1/iso/aeso-intl/snapshot · /api/v1/iso/hydroquebec/snapshot

Nordics: measured per bidding zone from ENTSO-E: GET /api/v1/grid/latest/EU_SE_3 (also EU_SE_1/2/4, EU_NO_1/2, EU_FI, EU_DK_1/2).

MCP tool: get_grid_data({"iso": "AESO"}) works for both, and get_grid_data({"iso": "EU_SE_3"}) for a Nordic zone.