DCPI extends beyond the 286 US/Canadian ISO zones with first-class coverage of three international grids. All three feeds are live and updated daily.
| Grid | Installed Capacity | Generation Mix | As Of |
|---|---|---|---|
| AESO Alberta, Canada |
— | data unavailable | 2026-09-21 07:49:48 UTC |
| Hydro-Québec Québec, Canada |
— | data unavailable | 2026-09-21 01:30:00 UTC |
| Nord Pool Nordic + Baltic (15 zones) |
— | data unavailable | 2026-09-21 07:49:48 UTC |
Hyperscaler capex is spilling out of saturated US markets (Northern VA at AVOID, Atlanta caution) and into jurisdictions with low-carbon power surplus. Hydro-Québec (94% hydro), Nord Pool (51% hydro + 19% wind + 18% nuclear), and AESO (Alberta, with emerging wind-solar at low LCOE) are three frontiers operator capex planners now actively evaluate.
API: GET /api/v1/iso/aeso-intl/snapshot · /api/v1/iso/hydroquebec/snapshot · /api/v1/iso/nordpool-intl/snapshot
MCP tool: get_grid_data({"iso": "AESO"}) works for all three.