What is the Data Center Power Index verdict for El Paso?

DC Hub's Data Center Power Index rates El Paso BUILD for new data-center power, with a composite score of 67.4 out of 100, as of Nov 4, 2026. El Paso is on the WECC grid.

MarketEl Paso
State or regionTX
Grid operatorWECC
DCPI verdictBUILD
DCPI composite score67.4 of 100
Verdict and scores last changedOct 4, 2026
ALBUQUERQUE, NM (WECC)CAUTION
Aurora, CO, CO (WECC)CAUTION
Beaverton, OR (WECC)CAUTION
Bend, OR (WECC)AVOID
Billings, MT (WECC)AVOID

Source: DC Hub Data Center Power Index (DCPI), published Nov 4, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for El Paso?", https://dchub.cloud/ai-answers/dcpi-verdict-el-paso, as of Nov 4, 2026.

The figures and their dates

As of Nov 4, 2026, the figures on this page are: Market: El Paso; State or region: TX; Grid operator: WECC; DCPI verdict: BUILD; DCPI composite score: 67.4 of 100; Verdict and scores last changed: Oct 4, 2026; ALBUQUERQUE, NM (WECC): CAUTION; Aurora, CO, CO (WECC): CAUTION; Beaverton, OR (WECC): CAUTION; Bend, OR (WECC): AVOID; Billings, MT (WECC): AVOID. Source: DC Hub Data Center Power Index (DCPI), published Nov 4, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on El Paso, open the El Paso market page, El Paso DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.