What is the Data Center Power Index verdict for Boydton?

DC Hub's Data Center Power Index rates Boydton AVOID for new data-center power, with a composite score of 21.0 out of 100, as of Nov 4, 2026. Boydton is on the PJM grid.

MarketBoydton
State or regionVA
Grid operatorPJM
DCPI verdictAVOID
DCPI composite score21.0 of 100
Verdict and scores last changedNov 4, 2026
Aldie, VA (PJM)AVOID
ASHBURN, VA (PJM)AVOID
Bristow, VA (PJM)AVOID
Chantilly, VA (PJM)AVOID
Chester, VA (PJM)AVOID

Source: DC Hub Data Center Power Index (DCPI), published Nov 4, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Boydton?", https://dchub.cloud/ai-answers/dcpi-verdict-boydton, as of Nov 4, 2026.

The figures and their dates

As of Nov 4, 2026, the figures on this page are: Market: Boydton; State or region: VA; Grid operator: PJM; DCPI verdict: AVOID; DCPI composite score: 21.0 of 100; Verdict and scores last changed: Nov 4, 2026; Aldie, VA (PJM): AVOID; ASHBURN, VA (PJM): AVOID; Bristow, VA (PJM): AVOID; Chantilly, VA (PJM): AVOID; Chester, VA (PJM): AVOID. Source: DC Hub Data Center Power Index (DCPI), published Nov 4, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on Boydton, open the Boydton market page, Boydton DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.

Related