How much data center capacity (MW) is in Phoenix?
Phoenix has 2,341 MW operational and 557 MW under construction among the verified sites DC Hub lists that report capacity, as of Nov 24, 2026. Counting every tracked site that reports MW, including unverified directory listings, the total is about 4,323 MW. Both are floors: they sum only the sites that report their MW, and most do not.
| Market | Phoenix |
|---|---|
| Operational (verified sites) | 2,341 MW |
| Under construction (verified sites) | 557 MW |
| Verified sites listed | 2,898 MW |
| All tracked sites that report MW | about 4,323 MW (floor) |
Source: DC Hub data center inventory, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "How much data center capacity (MW) is in Phoenix?", https://dchub.cloud/ai-answers/data-center-capacity-phoenix, as of Nov 24, 2026.
The figures and their dates
As of Nov 24, 2026, the figures on this page are: Market: Phoenix; Operational (verified sites): 2,341 MW; Under construction (verified sites): 557 MW; Verified sites listed: 2,898 MW; All tracked sites that report MW: about 4,323 MW (floor). Source: DC Hub data center inventory, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The capacity figure sums only the sites that report their megawatts, so it is a floor. A market with several unreported sites is larger than the number shown. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Phoenix, open the Phoenix market page, Phoenix DCPI breakdown, or any of the data centers tracked there:
- Microsoft Azure West US 3 (Phoenix)
- Compass Goodyear Campus (Phoenix)
- EdgeCore Mesa Campus PH01
- Meta Phoenix DC
- Vantage Phoenix Campus
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.