← All pockets · DCPI index

Richardson BUILD

ERCOT · TX · last computed 2026-10-20 · data last changed 2026-09-24

59.0
DCPI score
0-100 buildability composite · full breakdown
Locked
Pocket rank score
excess − constraint/2 − time-to-power penalty ± verdict · not the DCPI composite
Locked
Excess power
Developer and above
Locked
Grid constraint
Developer and above
Locked
Time to power
Developer and above
Why this verdict: DCPI verdict: BUILD; adequate excess capacity.

30-day excess-power trend

Locked The 30-day excess-power trend is on Developer and above.

Comparable markets in ERCOT

MarketISOStateVerdictExcess
Allen ERCOT TX CAUTION Locked
Carrollton ERCOT TX BUILD Locked
Dallas ERCOT TX CAUTION Locked
Fort Worth ERCOT TX BUILD Locked
Garland ERCOT TX BUILD Locked
Share on X Share on LinkedIn JSON