---
description: Is Zurich a good data center market for power? DCPI verdict AVOID, score 19.7/100 (ENTSOE-CH), as of 2026-11-12. 110 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Zurich data centers: power, grid and capacity | DC Hub"
---

# Zurich data center market

Power availability in Zurich: DCPI verdict AVOID, composite score 19.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 257 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Zurich data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Zurich market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.7/100**

MW, all listings**110**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Zurich at a glance

Zurich has 50 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (50 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 50 |
| Total listed | 50 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Zurich

DC Hub does not hold a lease-rate figure for this market yet.

The market is fragmented across multiple operators, with AtlasEdge and Init7 Winterthur each running two tracked facilities.

The DCPI verdict of AVOID reflects structural headwinds on the power supply side. Together, these readings suggest that operators seeking incremental power allocation face elevated competition for limited available supply. This combination creates a ceiling effect: new capacity additions will encounter genuine bottlenecks in securing grid connection slots and stable power feed agreements rather than abundant optionality.

Digital Realty announced a fourth data center in Zurich (ZUR4) with 15 MW of capacity, representing the only publicly tracked greenfield project in the region. The absence of recent acquisition or sale activity in Zurich contrasts with deal flow in adjacent Central European hubs, suggesting either market maturity or limited availability of operating assets at commercially viable terms. The operator roster shows no single dominant player, with the top five operators controlling only 15 of 91 tracked sites.

## Data centers in Zurich

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Vantage Zurich](https://dchub.cloud/facilities/vantage-data-centers-vantage-zurich-29e39690) | Vantage Data Centers | Operational | 50 |
| [AWS EU Central 2 (Zurich)](https://dchub.cloud/facilities/amazon-web-services-aws-eu-central-2-zurich-b19a4b1d) | Amazon Web Services | Operational |  |
| [Azure Switzerland North Zurich](https://dchub.cloud/facilities/microsoft-azure-switzerland-north-zurich-4643a268) | Microsoft | Operational |  |
| [Colt DCS Zurich](https://dchub.cloud/facilities/colt-dcs-colt-dcs-zurich-084500c3) | Colt DCS | Operational |  |
| [Equinix ZH5 - Zurich, South](https://dchub.cloud/facilities/equinix-equinix-zh5-zurich-south-b8e94a89) | Equinix | Operational |  |
| [Google Cloud europe-west6 Zurich](https://dchub.cloud/facilities/google-google-cloud-europe-west6-zurich-a450f660) | Google | Operational |  |
| [Oracle Cloud Switzerland Zurich](https://dchub.cloud/facilities/oracle-oracle-cloud-switzerland-zurich-5b4ac003) | Oracle | Operational |  |
| [Vantage Zurich Switzerland](https://dchub.cloud/facilities/vantage-data-centers-vantage-zurich-switzerland-c92dc058) | Vantage Data Centers | Operational |  |
| [colozüri.ch](https://dchub.cloud/facilities/nts-colocation-ag-colozrich-4c0219b4) | NTS Colocation AG | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Switzerland](https://dchub.cloud/facilities/in/ch).

## More on Zurich

- [Zurich DCPI score](https://dchub.cloud/dcpi/zurich)
- [Zurich market brief](https://dchub.cloud/markets/zurich/brief)

### Email me when the Zurich DCPI verdict changes

Email me when Zurich's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Zurich: 110 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=zurich) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=zurich)

JSON: [/api/v1/markets/zurich/deep-dive](https://dchub.cloud/api/v1/markets/zurich/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Zurich","item":"https://dchub.cloud/markets/zurich"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Zurich Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:33:10.477696+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/zurich",
 "wordCount":257,
 "about":{"@type":"Place","name":"Zurich"},
 "description":"Live data-center market analysis. DCPI score 19.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "zurich", "name": "Zurich Data Center Market — DC Hub", "description": "Live data-center market measurements for Zurich, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/zurich", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Zurich"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 110.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:53."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:53.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:53."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/zurich#webpage", "url": "https://dchub.cloud/markets/zurich", "name": "Zurich data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Zurich data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Zurich market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Zurich data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Zurich market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
