---
description: Is Worthington a good data center market for power? DCPI verdict AVOID, score 19.8/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Worthington data centers: power, grid and capacity | DC Hub"
---

# Worthington data center market

Power availability in Worthington: DCPI verdict AVOID, composite score 19.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 243 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Worthington data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Worthington market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Worthington

DC Hub does not hold a lease-rate figure for this market yet.

Worthington's data center footprint remains minimal, with three tracked facilities and a single operator on record. DataCenter.BZ, LLC operates the market's sole identified site. No tracked facility has reported megawatt capacity to the database, preventing a meaningful assessment of installed power density or reserve margins within the market itself.

Together, these metrics signal that new power procurement for additional or expanded facilities will face material headwinds. Securing incremental MW through new builds, power purchase agreements, or grid expansions is not assured and will require developer coordination with local utilities on transmission readiness and generation adequacy.

Deal flow into Worthington has been absent during the tracked period. No M&A or build announcements have been recorded. Operator concentration remains extreme—three facilities under one active operator leaves the market highly fragmented and offers limited insight into competitive dynamics or demand signals.

## More on Worthington

- [Worthington DCPI score](https://dchub.cloud/dcpi/worthington)
- [Worthington market brief](https://dchub.cloud/markets/worthington/brief)
- [Ohio data center market brief](https://dchub.cloud/states/ohio/brief)
- [Ohio data center tax incentives](https://dchub.cloud/states/ohio/data-center-incentives)

### Email me when the Worthington DCPI verdict changes

Email me when Worthington's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Worthington market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=worthington) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=worthington)

JSON: [/api/v1/markets/worthington/deep-dive](https://dchub.cloud/api/v1/markets/worthington/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Worthington","item":"https://dchub.cloud/markets/worthington"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Worthington Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T09:02:40.545236+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/worthington",
 "wordCount":243,
 "about":{"@type":"Place","name":"Worthington"},
 "description":"Live data-center market analysis. DCPI score 19.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "worthington", "name": "Worthington Data Center Market — DC Hub", "description": "Live data-center market measurements for Worthington, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/worthington", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Worthington"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:22."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:22.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:22."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/worthington#webpage", "url": "https://dchub.cloud/markets/worthington", "name": "Worthington data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Worthington data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Worthington market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Worthington data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Worthington market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
