---
description: Is Wood Dale a good data center market for power? DCPI verdict AVOID, score 20.8/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Wood Dale data centers: power, grid and capacity | DC Hub"
---

# Wood Dale data center market

Power availability in Wood Dale: DCPI verdict AVOID, composite score 20.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 252 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Wood Dale data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Wood Dale market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Wood Dale

DC Hub does not hold a lease-rate figure for this market yet.

Wood Dale's power supply profile presents structural headwinds for operators seeking incremental capacity. Six tracked facilities operate in the market, with Element Critical operating two sites and CyrusOne maintaining one facility.

The DCPI verdict of AVOID reflects what new power procurement would face here.

Deal flow in Wood Dale remains inactive. No recent transactions have been tracked in the market, leaving the operator base unchanged: two Element Critical entities and one CyrusOne facility comprise the tracked competitive landscape.

## Data centers in Wood Dale

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CYRUSONE CHI6 FACILITY](https://dchub.cloud/facilities/cyrusone-chi6-facility-cea4181e) | CyrusOne |  |  |
| [Element Critical Chicago CH2](https://dchub.cloud/facilities/element-critical-llc-element-critical-chicago-ch2-ebca6d87) | Element Critical, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Wood Dale

- [Wood Dale DCPI score](https://dchub.cloud/dcpi/wood-dale)
- [Wood Dale market brief](https://dchub.cloud/markets/wood-dale/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Wood Dale DCPI verdict changes

Email me when Wood Dale's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Wood Dale market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=wood-dale) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=wood-dale)

JSON: [/api/v1/markets/wood-dale/deep-dive](https://dchub.cloud/api/v1/markets/wood-dale/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Wood Dale","item":"https://dchub.cloud/markets/wood-dale"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Wood Dale Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:33:02.656498+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/wood-dale",
 "wordCount":252,
 "about":{"@type":"Place","name":"Wood Dale"},
 "description":"Live data-center market analysis. DCPI score 20.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "wood-dale", "name": "Wood Dale Data Center Market — DC Hub", "description": "Live data-center market measurements for Wood Dale, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/wood-dale", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Wood Dale"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:31."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:31.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:31."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/wood-dale#webpage", "url": "https://dchub.cloud/markets/wood-dale", "name": "Wood Dale data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Wood Dale data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Wood Dale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Wood Dale data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Wood Dale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
