# West Jordan data center market

Power availability in West Jordan: DCPI verdict CAUTION, composite score 47.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the West Jordan data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the West Jordan market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.3/100**

MW, all listings**175**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## West Jordan at a glance

West Jordan has 175 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Novva Data Centers (175 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 175 |
| Total listed | 175 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in West Jordan

DC Hub does not hold a lease-rate figure for this market yet.

West Jordan's data center footprint remains small and operator-consolidated: six tracked facilities with Flexential operating three of them (two under the Flexential brand, one as Flexential Corp.), while NOVVA operates two sites under distinct legal entities. The market has no recorded recent deal activity, and only one of the six tracked facilities publicly reports its power consumption.

This combination means new power is available but obtaining it requires navigating real obstacles.

Operator concentration is notable: Flexential operates half the tracked base, and NOVVA controls a second facility under two corporate entities. The absence of recent deal flow does not indicate market dormancy so much as a discrete installed base with limited turnover or transition activity.

## Data centers in West Jordan

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Novva West Jordan Campus Phase 1](https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3) | Novva Data Centers | Operational | 175 |
| [Flexential - Salt Lake City/South Valley (SLC09)](https://dchub.cloud/facilities/flexential-corp-flexential-salt-lake-citysouth-valley-slc09-076bc054) | Flexential Corp. | Operational |  |
| [Flexential Salt Lake City - South Valley](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-south-valley-12ac812b) | Flexential | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Utah](https://dchub.cloud/facilities/in/us/utah).

## More on West Jordan

- [West Jordan DCPI score](https://dchub.cloud/dcpi/west-jordan)
- [West Jordan market brief](https://dchub.cloud/markets/west-jordan/brief)
- [Utah data center market brief](https://dchub.cloud/states/utah/brief)
- [Utah data center tax incentives](https://dchub.cloud/states/utah/data-center-incentives)

### Email me when the West Jordan DCPI verdict changes

Email me when West Jordan's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

West Jordan: 175 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=west-jordan) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=west-jordan)

JSON: [/api/v1/markets/west-jordan/deep-dive](https://dchub.cloud/api/v1/markets/west-jordan/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"West Jordan","item":"https://dchub.cloud/markets/west-jordan"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"West Jordan Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:32:31.838886+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/west-jordan",
 "wordCount":199,
 "about":{"@type":"Place","name":"West Jordan"},
 "description":"Live data-center market analysis. DCPI score 47.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "west-jordan", "name": "West Jordan Data Center Market — DC Hub", "description": "Live data-center market measurements for West Jordan, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/west-jordan", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "West Jordan"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 175.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:38."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:38.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:38."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/west-jordan#webpage", "url": "https://dchub.cloud/markets/west-jordan", "name": "West Jordan data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the West Jordan data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the West Jordan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the West Jordan data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the West Jordan market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```