# Weehawken data center market

Power availability in Weehawken: DCPI verdict AVOID, composite score 22.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 264 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Weehawken data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Weehawken market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.4/100**

MW, all listings**21**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.6. The index is recomputed through the day and reads 22.4 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Weehawken at a glance

Weehawken has 21 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (14 MW) and Cyxtera (7 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 21 |
| Total listed | 21 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Weehawken

DC Hub does not hold a lease-rate figure for this market yet.

Weehawken's tracked data center footprint spans 21 MW across seven facilities, with Digital Realty operating two sites and four other operators—Centersquare, CoreWeave, Cyxtera, and Lumen Technologies—each maintaining single locations. The market remains fragmented across operators, with no single entity commanding dominant control. No recent deals have been tracked in this market.

Operator composition shows diversification across five separate entities managing the 21 MW base, a pattern distinct from concentrated markets like Secaucus where single operators control multiple sites and extract pricing leverage. CoreWeave's presence reflects emerging demand from AI and machine learning workloads, a segment increasingly driving data center site selection in the Northeast corridor.

Operators evaluating new capacity here should conduct detailed power feasibility studies early in site planning.

## Data centers in Weehawken

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Realty New Jersey EWR10](https://dchub.cloud/facilities/digital-realty-digital-realty-new-jersey-ewr10-d7676502) | Digital Realty | Operational | 14 |
| [Cyxtera (Digital Realty Trust) Citibank Data Center](https://dchub.cloud/facilities/cyxtera-cyxtera-digital-realty-trust-citibank-data-center-902bc0c2) | Cyxtera | Operational | 7 |
| [Centersquare New Jersey (EWR2)](https://dchub.cloud/facilities/centersquare-centersquare-new-jersey-ewr2-403c2c4e) | Centersquare | Operational |  |
| [CoreWeave LGA1 (Weehawken)](https://dchub.cloud/facilities/coreweave-coreweave-lga1-weehawken-44279c4d) | CoreWeave | Operational |  |
| [Level(3) Weehawken](https://dchub.cloud/facilities/lumen-technologies-level3-weehawken-a9523e2b) | Lumen Technologies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Weehawken

- [Weehawken DCPI score](https://dchub.cloud/dcpi/weehawken)
- [Weehawken market brief](https://dchub.cloud/markets/weehawken/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Weehawken DCPI verdict changes

Email me when Weehawken's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Weehawken: 21 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=weehawken) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=weehawken)

JSON: [/api/v1/markets/weehawken/deep-dive](https://dchub.cloud/api/v1/markets/weehawken/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Weehawken","item":"https://dchub.cloud/markets/weehawken"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Weehawken Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:32:25.482322+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/weehawken",
 "wordCount":264,
 "about":{"@type":"Place","name":"Weehawken"},
 "description":"Live data-center market analysis. DCPI score 22.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "weehawken", "name": "Weehawken Data Center Market — DC Hub", "description": "Live data-center market measurements for Weehawken, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/weehawken", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Weehawken"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 21.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:39."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:39.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:39."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/weehawken#webpage", "url": "https://dchub.cloud/markets/weehawken", "name": "Weehawken data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Weehawken data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Weehawken market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Weehawken data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Weehawken market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```