---
description: Is Warsaw a good data center market for power? DCPI verdict AVOID, score 14.7/100 (ENTSOE-PL), as of 2026-11-12. 45 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Warsaw data centers: power, grid and capacity | DC Hub"
---

# Warsaw data center market

Power availability in Warsaw: DCPI verdict AVOID, composite score 14.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Warsaw data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Warsaw market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**14.7/100**

MW, all listings**45**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Warsaw at a glance

Warsaw has 45 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (45 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 45 |
| Total listed | 45 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Warsaw

DC Hub does not hold a lease-rate figure for this market yet.

Only one operator in the market currently reports megawatt capacity to DC Hub's tracking system. The competitive structure remains distributed, with no single operator controlling a dominant share of tracked supply.

Deal flow remains dormant; no recent transactions have been tracked in Warsaw itself. However, adjacent activity signals regional momentum: Emitel, a Polish operator, acquired 2 MW of capacity near Warsaw in May 2026, and Foresight announced a stake in a Polish developer operating two facilities with combined 270 MW capacity. The operator roster shows no recent M&A, consolidation, or exits among the top five players.

## Data centers in Warsaw

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Vantage Warsaw](https://dchub.cloud/facilities/vantage-data-centers-vantage-warsaw-8fbd5798) | Vantage Data Centers | Operational | 45 |
| [ATMAN Data Center Warsaw-1 (WAW-1, Grochowska 21A)](https://dchub.cloud/facilities/atman-sp-z-oo-atman-data-center-warsaw-1-waw-1-grochowska-21a-99ca5d16) | Atman Sp. z o.o. | Operational |  |
| [ATMAN Data Center Warsaw-2 (WAW-2, Konstruktorska 5)](https://dchub.cloud/facilities/atman-sp-z-oo-atman-data-center-warsaw-2-waw-2-konstruktorska-5-b4c599b5) | Atman Sp. z o.o. | Operational |  |
| [Azure Poland Central Warsaw](https://dchub.cloud/facilities/microsoft-azure-poland-central-warsaw-26aefe54) | Microsoft | Operational |  |
| [EdgeConneX Warsaw (EDCWAW02)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-warsaw-edcwaw02-dcb75382) | EdgeConneX Inc. | Operational |  |
| [EdgeConneX Warsaw (EDCWAW03)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-warsaw-edcwaw03-a5f467f2) | EdgeConneX Inc. | Operational |  |
| [Equinix WA1 - Warsaw, Centrum LIM](https://dchub.cloud/facilities/equinix-equinix-wa1-warsaw-centrum-lim-4dff58ea) | Equinix | Operational |  |
| [Equinix WA3 - Warsaw](https://dchub.cloud/facilities/equinix-equinix-wa3-warsaw-6b733137) | Equinix | Operational |  |
| [Google Cloud europe-central2 Warsaw](https://dchub.cloud/facilities/google-google-cloud-europe-central2-warsaw-b2a5cf0c) | Google | Operational |  |
| [Modułowe Data Center](https://dchub.cloud/facilities/exatel-sa-moduowe-data-center-69de9a4c) | Exatel S.A. | Operational |  |
| [Netia Data Center HEART](https://dchub.cloud/facilities/netia-sa-netia-data-center-heart-7f5a82b6) | Netia S.A. | Operational |  |
| [Netia Warsaw (WARSC001)](https://dchub.cloud/facilities/netia-sa-netia-warsaw-warsc001-0cad8d93) | Netia S.A. | Operational |  |
| [OVHcloud Ożarów (WAW-1)](https://dchub.cloud/facilities/ovh-sp-z-oo-ovhcloud-oarw-waw-1-d7fd3485) | OVH Sp. z o.o. | Operational |  |
| [OVHcloud Warsaw PL](https://dchub.cloud/facilities/ovhcloud-ovhcloud-warsaw-pl-7c744713) | OVHcloud | Operational |  |
| [Scaleway Warsaw WAW1](https://dchub.cloud/facilities/scaleway-scaleway-warsaw-waw1-e8bba6e9) | Scaleway | Operational |  |
| [Vantage Warsaw Poland](https://dchub.cloud/facilities/vantage-data-centers-vantage-warsaw-poland-1338b637) | Vantage Data Centers | Operational |  |
| [Vantage Warsaw WAW1](https://dchub.cloud/facilities/vantage-data-centers-vantage-warsaw-waw1-9a09916a) | Vantage Data Centers | Operational |  |
| [Warsaw](https://dchub.cloud/facilities/equinix-warsaw-748ec07c) | Equinix | Operational |  |
| [Warsaw, Poland](https://dchub.cloud/facilities/vantage-data-centers-warsaw-poland-054af2fa) | Vantage Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Poland](https://dchub.cloud/facilities/in/pl).

## More on Warsaw

- [Warsaw DCPI score](https://dchub.cloud/dcpi/warsaw)
- [Warsaw market brief](https://dchub.cloud/markets/warsaw/brief)

### Email me when the Warsaw DCPI verdict changes

Email me when Warsaw's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Warsaw: 45 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=warsaw) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=warsaw)

JSON: [/api/v1/markets/warsaw/deep-dive](https://dchub.cloud/api/v1/markets/warsaw/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Warsaw","item":"https://dchub.cloud/markets/warsaw"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Warsaw Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:32:03.584710+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/warsaw",
 "wordCount":231,
 "about":{"@type":"Place","name":"Warsaw"},
 "description":"Live data-center market analysis. DCPI score 14.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "warsaw", "name": "Warsaw Data Center Market — DC Hub", "description": "Live data-center market measurements for Warsaw, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/warsaw", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Warsaw"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 45.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 14.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:50."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:50.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:50."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/warsaw#webpage", "url": "https://dchub.cloud/markets/warsaw", "name": "Warsaw data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Warsaw data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Warsaw market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Warsaw data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Warsaw market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
