---
description: Is Vint Hill a good data center market for power? DCPI verdict AVOID, score 22.3/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Vint Hill data centers: power, grid and capacity | DC Hub"
---

# Vint Hill data center market

Power availability in Vint Hill: DCPI verdict AVOID, composite score 22.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 226 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Vint Hill data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Vint Hill market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Vint Hill

DC Hub does not hold a lease-rate figure for this market yet.

Vint Hill operates seven tracked facilities dominated by OVH US East and OVHcloud. The market lacks granular capacity reporting—only one of seven tracked sites has disclosed megawatt figures—making precise footprint assessment impossible. What is measurable: operator concentration remains high, with OVH entities controlling the visible supply base, and deal flow has stalled with no recent transactions recorded.

Together, these scores indicate that operators pursuing new capacity additions should expect elevated difficulty and cost in sourcing power above current commitments.

Deal flow has dried. No recent transactions are tracked in Vint Hill, a notable absence given sustained regional demand. Vint Hill's silence on recent deals, combined with its tight power profile, suggests the market is not actively trading or expanding. The two tracked operators remain OVH properties with no new entrants or announced capacity plays.

Power availability will remain the binding variable for any future development in Vint Hill.

## Data centers in Vint Hill

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [OVH US East Vint Hill](https://dchub.cloud/facilities/ovh-us-east-vint-hill-ovh-us-east-vint-hill-2c2d4143) |  | Operational |  |
| [OVHcloud Virginia US](https://dchub.cloud/facilities/ovhcloud-ovhcloud-virginia-us-fa65500d) | OVHcloud | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Vint Hill

- [Vint Hill DCPI score](https://dchub.cloud/dcpi/vint-hill)
- [Vint Hill market brief](https://dchub.cloud/markets/vint-hill/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Vint Hill DCPI verdict changes

Email me when Vint Hill's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Vint Hill market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=vint-hill) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=vint-hill)

JSON: [/api/v1/markets/vint-hill/deep-dive](https://dchub.cloud/api/v1/markets/vint-hill/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Vint Hill","item":"https://dchub.cloud/markets/vint-hill"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Vint Hill Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:46.880993+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/vint-hill",
 "wordCount":226,
 "about":{"@type":"Place","name":"Vint Hill"},
 "description":"Live data-center market analysis. DCPI score 22.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "vint-hill", "name": "Vint Hill Data Center Market — DC Hub", "description": "Live data-center market measurements for Vint Hill, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/vint-hill", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Vint Hill"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:05."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:05.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:05."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/vint-hill#webpage", "url": "https://dchub.cloud/markets/vint-hill", "name": "Vint Hill data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Vint Hill data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Vint Hill market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Vint Hill data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Vint Hill market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
