---
description: Is Vienna a good data center market for power? DCPI verdict AVOID, score 19.2/100 (ENTSOE-AT), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Vienna data centers: power, grid and capacity | DC Hub"
---

# Vienna data center market

Power availability in Vienna: DCPI verdict AVOID, composite score 19.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 259 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Vienna data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Vienna market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Vienna

DC Hub does not hold a lease-rate figure for this market yet.

The market shows limited recent transaction activity, with no deals recorded in the tracked window. The operator landscape includes secondary players such as AtlasEdge, which operates two facilities in the region.

The combination suggests that operators planning brownfield or greenfield expansion should anticipate extended lead times for power allocation and elevated coordination requirements with local grid operators. This is not a statement about market demand or facility quality, but rather a signal about the logistics and cost profile of sourcing new supply.

Deal flow in Vienna has stalled, with zero transactions tracked in the recent window.

## Data centers in Vienna

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [ATOS Datacenter Siemens City](https://dchub.cloud/facilities/atos-it-solutions-and-services-gmbh-atos-datacenter-siemens-city-4ec7f20c) | ATOS IT Solutions and Services GmbH | Operational |  |
| [Arelion Wien Süd](https://dchub.cloud/facilities/arelion-arelion-wien-sd-4c05cf4b) | Arelion | Operational |  |
| [AtlasEdge DC Vienna VIE001](https://dchub.cloud/facilities/atlasedge-atlasedge-dc-vienna-vie001-a21aa40a) | AtlasEdge | Operational |  |
| [AtlasEdge DC Vienna VIE002](https://dchub.cloud/facilities/atlasedge-atlasedge-dc-vienna-vie002-ec613bb3) | AtlasEdge | Operational |  |
| [Azure Austria East Vienna](https://dchub.cloud/facilities/microsoft-azure-austria-east-vienna-6624bbda) | Microsoft | Operational |  |
| [Digital Realty VIE1/2 - Vienna](https://dchub.cloud/facilities/digital-realty-digital-realty-vienna-vie1-2-e60a1dff) | Digital Realty | Operational |  |
| [Interxion VIE2 Vienna](https://dchub.cloud/facilities/digital-realty-interxion-vie2-vienna-52a024e9) | Digital Realty | Operational |  |
| [NTT Vienna1 Data Center (VIE1)](https://dchub.cloud/facilities/ntt-datas-global-data-centers-division-ntt-vienna1-data-center-vie1-df1e626e) | NTT DATA's Global Data Centers division | Operational |  |
| [Raiffeisen Informatik Data Center (RDC)](https://dchub.cloud/facilities/raiffeisen-informatik-gmbh-co-kg-raiffeisen-informatik-data-center-rdc-5d19f781) | Raiffeisen Informatik GmbH & Co KG | Operational |  |
| [Vienna Twin Tower](https://dchub.cloud/facilities/immofinanz-ag-vienna-twin-tower-53564c35) | IMMOFINANZ AG | Operational |  |
| [Vienna University Computer Center (Wien)](https://dchub.cloud/facilities/university-of-vienna-vienna-university-computer-center-wien-740c351f) | University of Vienna | Operational |  |
| [next layer Fleischmarkt](https://dchub.cloud/facilities/next-layer-telekommunikationsdienstleistungs-und-beratungs-gmbh-next-layer-fleischmarkt-aeab1bfe) | next layer Telekommunikationsdienstleistungs- und Beratungs GmbH | Operational |  |
| [ÖBB Telekom Service Datacenter](https://dchub.cloud/facilities/oebb-infrastruktur-ag-bb-telekom-service-datacenter-6b768f9e) | OeBB Infrastruktur AG | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Austria](https://dchub.cloud/facilities/in/at).

## More on Vienna

- [Vienna DCPI score](https://dchub.cloud/dcpi/vienna)
- [Vienna market brief](https://dchub.cloud/markets/vienna/brief)

### Email me when the Vienna DCPI verdict changes

Email me when Vienna's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Vienna market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=vienna) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=vienna)

JSON: [/api/v1/markets/vienna/deep-dive](https://dchub.cloud/api/v1/markets/vienna/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Vienna","item":"https://dchub.cloud/markets/vienna"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Vienna Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:39.521675+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/vienna",
 "wordCount":259,
 "about":{"@type":"Place","name":"Vienna"},
 "description":"Live data-center market analysis. DCPI score 19.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "vienna", "name": "Vienna Data Center Market — DC Hub", "description": "Live data-center market measurements for Vienna, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/vienna", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Vienna"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:51."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:51.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:51."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/vienna#webpage", "url": "https://dchub.cloud/markets/vienna", "name": "Vienna data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Vienna data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Vienna market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Vienna data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Vienna market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
