# Vancouver data center market

Power availability in Vancouver: DCPI verdict AVOID, composite score 32.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Vancouver data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Vancouver market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.5/100**

MW, all listings**15**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Vancouver at a glance

Vancouver has 15 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Cologix (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 15 |
| Total listed | 15 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Vancouver

DC Hub does not hold a lease-rate figure for this market yet.

Only one tracked site in the market publicly reports megawatt capacity, making aggregate footprint assessment impossible. No recent deals have been tracked in this market.

This combination—sufficient generation coupled with delivery barriers—defines the AVOID threshold. Operators siting or expanding facilities here face procurement challenges that outweigh the nominal availability of power in the region.

Operator concentration is visible: Cologix commands the plurality with 11 combined sites across its entity records. Carrier Connect Systems and Navigata round out the top four by headcount, but the absence of tracked deal activity leaves operator strategy and market velocity unclear.

## Data centers in Vancouver

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cologix Vancouver](https://dchub.cloud/facilities/cologix-cologix-vancouver-7dbf9aa4) | Cologix | Operational | 15 |
| [Tech Futures YVR1](https://dchub.cloud/facilities/tech-futures-interactive-inc-tech-futures-yvr1-3bba1e35) | Tech Futures Interactive Inc. | Operational |  |
| [eStruxture VAN-2](https://dchub.cloud/facilities/estruxture-data-centers-inc-estruxture-van-2-a29db2e8) | eStruxture Data Centers Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Canada](https://dchub.cloud/facilities/in/ca).

## More on Vancouver

- [Vancouver DCPI score](https://dchub.cloud/dcpi/vancouver)
- [Vancouver market brief](https://dchub.cloud/markets/vancouver/brief)

### Email me when the Vancouver DCPI verdict changes

Email me when Vancouver's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Vancouver: 15 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=vancouver) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=vancouver)

JSON: [/api/v1/markets/vancouver/deep-dive](https://dchub.cloud/api/v1/markets/vancouver/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Vancouver","item":"https://dchub.cloud/markets/vancouver"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Vancouver Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:31.622091+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/vancouver",
 "wordCount":254,
 "about":{"@type":"Place","name":"Vancouver"},
 "description":"Live data-center market analysis. DCPI score 32.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "vancouver", "name": "Vancouver Data Center Market — DC Hub", "description": "Live data-center market measurements for Vancouver, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/vancouver", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Vancouver"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 15.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:23."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:23.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:23."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/vancouver#webpage", "url": "https://dchub.cloud/markets/vancouver", "name": "Vancouver data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Vancouver data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Vancouver market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Vancouver data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Vancouver market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```