---
description: Is Tustin a good data center market for power? DCPI verdict BUILD, score 59.6/100 (CAISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Tustin data centers: power, grid and capacity | DC Hub"
---

# Tustin data center market

Power availability in Tustin: DCPI verdict BUILD, composite score 59.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 259 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tustin data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tustin market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**59.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**BUILD**

## Colocation lease rates in Tustin

DC Hub does not hold a lease-rate figure for this market yet.

Tustin's tracked market consists of three facilities under single-operator dominance, with IC2NET operating one site. The market shows minimal transparency on aggregate capacity, reflecting either sparse megawatt footprints or limited reporting to DC Hub's tracking system. No recent deal activity has been recorded in Tustin, indicating a stable but dormant transaction landscape.

The BUILD verdict reflects that new power can reach this market, though developers should expect moderate lead times and coordination overhead with local utilities.

No recent deals tracked in Tustin suggest either market saturation among existing operators or limited third-party interest in entry. IC2NET's single tracked presence does not establish operator concentration in the same way that markets like Irvine show DataBank controlling four sites; rather, it reflects the limited scope of visible facilities. Without deal flow, operator strategy and competitive positioning remain opaque. The absence of announced transactions does not indicate suppressed demand or capital shortage—it reflects a market in which expansion may occur through organic build-by-operator rather than M&A.

## Data centers in Tustin

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [IC2NET Data Center](https://dchub.cloud/facilities/ic2net-ic2net-data-center-11327059) | IC2NET | Operational |  |
| [Lumen Technologies](https://dchub.cloud/facilities/lumen-technologies-ecadaadd) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [California](https://dchub.cloud/facilities/in/us/california).

## More on Tustin

- [Tustin DCPI score](https://dchub.cloud/dcpi/tustin)
- [Tustin market brief](https://dchub.cloud/markets/tustin/brief)
- [California data center market brief](https://dchub.cloud/states/california/brief)
- [California data center tax incentives](https://dchub.cloud/states/california/data-center-incentives)

### Email me when the Tustin DCPI verdict changes

Email me when Tustin's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tustin market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tustin) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tustin)

JSON: [/api/v1/markets/tustin/deep-dive](https://dchub.cloud/api/v1/markets/tustin/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tustin","item":"https://dchub.cloud/markets/tustin"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tustin Data Center Market Deep-Dive",
 "datePublished":"2026-11-09T09:01:55.752251+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tustin",
 "wordCount":259,
 "about":{"@type":"Place","name":"Tustin"},
 "description":"Live data-center market analysis. DCPI score 59.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tustin", "name": "Tustin Data Center Market — DC Hub", "description": "Live data-center market measurements for Tustin, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tustin", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tustin"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 59.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:42."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:42.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:42."}], "dateModified": "2026-11-09", "temporalCoverage": "2026-11-09"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tustin#webpage", "url": "https://dchub.cloud/markets/tustin", "name": "Tustin data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tustin data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tustin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tustin data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tustin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
