---
description: Is Tulsa a good data center market for power? DCPI verdict BUILD, score 65.1/100 (SPP), as of 2026-11-12. 4 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Tulsa data centers: power, grid and capacity | DC Hub"
---

# Tulsa data center market

Power availability in Tulsa: DCPI verdict BUILD, composite score 65.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 279 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tulsa data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tulsa market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**65.1/100**

MW, all listings**4**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Tulsa at a glance

Tulsa has 4 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are TierPoint (4 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 4 |
| Total listed | 4 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Tulsa

DC Hub does not hold a lease-rate figure for this market yet.

The operator base remains concentrated, with TierPoint holding the plurality of sites and Compass Datacenters Tulsa I representing a secondary footprint. Only one tracked facility publicly reports megawatt capacity, limiting visibility into aggregate market scale. The market shows a fragmented real estate profile typical of secondary metros, with room for additional infrastructure deployment.

This configuration signals that new power procurement remains viable, though not frictionless.

Deal flow in Tulsa has been quiet; no recent transactions have been tracked in the market. TierPoint's existing four-facility and two-facility clusters represent the dominant operator presence by count, though without reported capacity figures it remains unclear whether these sites represent a concentrated power footprint or distributed loads. The absence of recent M&A activity does not signal market dysfunction—secondary markets frequently see sustained operational presence without constant transaction velocity. Compass Datacenters' single tracked site provides a secondary operator anchor, establishing baseline competitive structure.

Tulsa's power environment supports greenfield and expansion activity at moderate risk, contingent on site-specific utility relationships and interconnection timelines typical of the region.

## Data centers in Tulsa

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [TierPoint Tulsa](https://dchub.cloud/facilities/tierpoint-tierpoint-tulsa-769f95eb) | TierPoint | Operational | 4 |
| [321 S Boston Ave](https://dchub.cloud/facilities/ocosa-321-s-boston-ave-2bc7449c) | OCOSA | Operational |  |
| [Cherokee Data Center](https://dchub.cloud/facilities/cherokee-data-center-d4921c0c) |  | Operational |  |
| [Jackson Technical Datacenter](https://dchub.cloud/facilities/jackson-technical-jackson-technical-datacenter-a40582b9) | Jackson Technical | Operational |  |
| [Lumen Tulsa 1](https://dchub.cloud/facilities/lumen-technologies-lumen-tulsa-1-d43bcd0d) | Lumen Technologies | Operational |  |
| [OCOSA](https://dchub.cloud/facilities/unknown-ocosa-e8705afb) |  | Operational |  |
| [TierPoint Tulsa OK](https://dchub.cloud/facilities/tierpoint-tierpoint-tulsa-ok-2db6b6bf) | TierPoint | Operational |  |
| [TierPoint Tulsa-Archer](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-tulsa-archer-3e61820f) | TierPoint, LLC | Operational |  |
| [TierPoint Tulsa-State Farm](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-tulsa-state-farm-fca26ca5) | TierPoint, LLC | Operational |  |
| [TulsaConnect DC3](https://dchub.cloud/facilities/tulsaconnect-tulsaconnect-dc3-45f0b3f5) | TulsaConnect | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oklahoma](https://dchub.cloud/facilities/in/us/oklahoma).

## More on Tulsa

- [Tulsa DCPI score](https://dchub.cloud/dcpi/tulsa)
- [Tulsa market brief](https://dchub.cloud/markets/tulsa/brief)
- [Oklahoma data center market brief](https://dchub.cloud/states/oklahoma/brief)
- [Oklahoma data center tax incentives](https://dchub.cloud/states/oklahoma/data-center-incentives)

### Email me when the Tulsa DCPI verdict changes

Email me when Tulsa's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tulsa: 4 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tulsa) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tulsa)

JSON: [/api/v1/markets/tulsa/deep-dive](https://dchub.cloud/api/v1/markets/tulsa/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tulsa","item":"https://dchub.cloud/markets/tulsa"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tulsa Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:16.916486+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tulsa",
 "wordCount":279,
 "about":{"@type":"Place","name":"Tulsa"},
 "description":"Live data-center market analysis. DCPI score 65.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tulsa", "name": "Tulsa Data Center Market — DC Hub", "description": "Live data-center market measurements for Tulsa, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tulsa", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tulsa"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 4.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 65.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:58."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:58.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:58."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tulsa#webpage", "url": "https://dchub.cloud/markets/tulsa", "name": "Tulsa data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tulsa data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tulsa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tulsa data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tulsa market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
