---
description: Is Tukwila a good data center market for power? DCPI verdict CAUTION, score 47.0/100 (WECC), as of 2026-11-12. 146 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Tukwila data centers: power, grid and capacity | DC Hub"
---

# Tukwila data center market

Power availability in Tukwila: DCPI verdict CAUTION, composite score 47 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 291 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Tukwila data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Tukwila market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.0/100**

MW, all listings**146**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Tukwila at a glance

Tukwila has 146 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Sabey (132 MW) and Digital Realty (14 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 146 |
| Total listed | 146 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Tukwila

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Seattle (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

The market is dominated by regional players: Sabey and Sabey Data Centers control the largest footprint, followed by Centersquare, DataBank, and Digital Realty each operating smaller presences. No recent deal activity has been recorded in the market registry, leaving the current operator structure and capacity baseline intact without new M&A-driven consolidation or expansion signals.

This combination signals that acquiring new power for incremental facility demand is neither freely available nor severely restricted; operators pursuing additional capacity should expect negotiation complexity and potential infrastructure upgrade requirements rather than immediate grid access.

Deal flow in Tukwila remains dormant with no tracked transactions. This absence mirrors broader patterns in peer markets where M&A activity decouples from underlying market fundamentals. The operator roster shows no signs of consolidation pressure or new entrant activity. Sabey's regional presence—holding six properties under its primary entity and two under Sabey Data Centers—demonstrates established operational continuity rather than portfolio reshuffling. No announcement data tracks recent investment rounds or strategic repositioning by tracked operators. The silence on deal activity provides no signal of market stress, competitive displacement, or growth acceleration.

## Data centers in Tukwila

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Intergate Seattle East Building 1](https://dchub.cloud/facilities/sabey-intergate-seattle-east-building-1-cd9e8730) | Sabey | Operational | 33 |
| [Intergate Seattle East Building 3](https://dchub.cloud/facilities/sabey-intergate-seattle-east-building-3-5bd76082) | Sabey | Operational | 33 |
| [Intergate Seattle East Building 5](https://dchub.cloud/facilities/sabey-intergate-seattle-east-building-5-a0e7746b) | Sabey | Operational | 33 |
| [Intergate Seattle West Building A](https://dchub.cloud/facilities/sabey-intergate-seattle-west-building-a-2941ba3a) | Sabey | Operational | 33 |
| [Intergate Seattle East Building 4](https://dchub.cloud/facilities/digital-realty-intergate-seattle-east-building-4-5dd8c130) | Digital Realty | Operational | 14 |
| [Centersquare Seattle (SEA1-B)](https://dchub.cloud/facilities/centersquare-centersquare-seattle-sea1-b-601af3cf) | Centersquare | Operational |  |
| [DataBank Seattle (SEA2)](https://dchub.cloud/facilities/databank-databank-seattle-sea2-d19e9423) | DataBank | Operational |  |
| [EdgeConneX Seattle (EDCSEA01)](https://dchub.cloud/facilities/edgeconnex-inc-edgeconnex-seattle-edcsea01-7c01f005) | EdgeConneX Inc. | Operational |  |
| [Intergate Seattle West Building B](https://dchub.cloud/facilities/sabey-intergate-seattle-west-building-b-0e6ace27) | Sabey | Operational |  |
| [Intergate Seattle West Building C](https://dchub.cloud/facilities/sabey-intergate-seattle-west-building-c-a25087c8) | Sabey | Operational |  |
| [Intergate West / Digital.forest / Fortress](https://dchub.cloud/facilities/sabey-data-centers-intergate-west-digitalforest-fortress-a9c28818) | Sabey Data Centers | Operational |  |
| [Sabey Intergate East Building 4](https://dchub.cloud/facilities/sabey-data-centers-sabey-intergate-east-building-4-5e01ffc1) | Sabey Data Centers | Operational |  |
| [WowRack](https://dchub.cloud/facilities/serverhosh-internet-service-wowrack-0b1b30a0) | Serverhosh Internet Service | Operational |  |
| [Wowrack Datacenter - Tukwila](https://dchub.cloud/facilities/wowrackcom-wowrack-datacenter-tukwila-3529923a) | Wowrack.com | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Washington](https://dchub.cloud/facilities/in/us/washington).

## More on Tukwila

- [Tukwila DCPI score](https://dchub.cloud/dcpi/tukwila)
- [Tukwila market brief](https://dchub.cloud/markets/tukwila/brief)
- [Washington data center market brief](https://dchub.cloud/states/washington/brief)
- [Washington data center tax incentives](https://dchub.cloud/states/washington/data-center-incentives)

### Email me when the Tukwila DCPI verdict changes

Email me when Tukwila's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Tukwila: 146 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=tukwila) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=tukwila)

JSON: [/api/v1/markets/tukwila/deep-dive](https://dchub.cloud/api/v1/markets/tukwila/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Tukwila","item":"https://dchub.cloud/markets/tukwila"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Tukwila Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:08.867032+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/tukwila",
 "wordCount":291,
 "about":{"@type":"Place","name":"Tukwila"},
 "description":"Live data-center market analysis. DCPI score 47.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "tukwila", "name": "Tukwila Data Center Market — DC Hub", "description": "Live data-center market measurements for Tukwila, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/tukwila", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Tukwila"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 146.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:58."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:58.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:58."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/tukwila#webpage", "url": "https://dchub.cloud/markets/tukwila", "name": "Tukwila data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Tukwila data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Tukwila market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Tukwila data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Tukwila market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
